Supplier bills
Few suppliers, low volume, but the coding today is wrong. The system routes each bill to the right place: capital to the build, repairs to R&M, utilities to opex. Nothing posts unclassified; you approve, it posts as a draft to Xero.
Hose and fittings usually default to Repairs & Maintenance. This line references PO CL360-07, an open build, so it is coded to the job as capital, not R&M. It lands on the asset, not the P&L.
Same supplier as our build pumps, but this is a repair at a live operating site with no build reference. Correctly coded to Repairs & Maintenance, not capitalised. The system does not capitalise everything.
Recurring utility mapped to the Warners Bay site. Coded to Site utilities in the operating entity. Auto-post eligible (supplier approval rate 100%).